The verdict in three sentences
Redesigning the website of a 30,000-resident municipality in the Toronto area costs between 50,000 and 150,000 CAD in 2026, usually through an RFQ or RFP under the municipal procurement bylaw. AODA compliance (WCAG 2.0 AA) is not optional: it is mandatory for public sector organizations and must be a weighted evaluation criterion. A realistic timeline is 4 to 7 months, including 6 to 8 weeks for procurement alone.
The procurement framework in 2026
A CAO must balance speed and legal safety. Each Ontario municipality sets its own thresholds in its procurement bylaw, but the pattern is similar. Above the CFTA threshold (around 133,800 CAD for goods and services in 2026, estimate) and CETA thresholds, an open competitive process must be published on a recognized platform.
| Estimated value | Typical process | Posting | Indicative procurement time |
|---|---|---|---|
| Under 25,000 CAD | Direct purchase | Not required, 3 quotes advised | 2 to 4 weeks |
| 25,000 to 100,000 CAD | Informal RFQ | Invited bidders or bids portal | 4 to 6 weeks |
| 100,000 to 133,800 CAD | Formal RFP | Municipal bids portal | 6 to 8 weeks |
| Above trade agreement thresholds | Open RFP | Bids portal + CFTA/CETA notice | 8 to 12 weeks |
| 4-year support contract | Depends on total value | Depends on cumulative threshold | Included in the RFP |
A common trap: forgetting to add build and support over 4 years. A 90,000 CAD redesign plus 12,000 CAD per year of support totals 138,000 CAD, which changes the posting required.
The budget line by line
Cost depends mainly on three blocks: the number of online services, integration with departments and partner agencies, and the accessibility level targeted.
| Item | 2026 market range (estimate) | Comment |
|---|---|---|
| Discovery, workshops, information architecture | 6,000 to 15,000 CAD | 4 to 6 workshops with council and staff |
| Accessible design system | 8,000 to 20,000 CAD | Contrast, visible focus, templates |
| CMS build (Drupal, WordPress, Granicus) | 20,000 to 60,000 CAD | 15 to 25 templates |
| Online services and forms | 6,000 to 25,000 CAD | Waste, permits, recreation |
| Shared events calendar and directory | 4,000 to 12,000 CAD | Feeds, decentralized editing |
| External WCAG audit and statement | 4,000 to 10,000 CAD | Sample of key pages |
| Content migration and training | 3,000 to 8,000 CAD | 200 to 600 pages |
Under AODA, designated public sector organizations must meet WCAG 2.0 AA on public websites and file accessibility compliance reports. Non-compliance can lead to administrative penalties of up to 100,000 CAD per day for corporations under the Act, and to public complaints that weigh on elected officials.
On the Kolonell side, we work mainly on the application blocks: an online services module, a facility booking portal or a shared calendar fall under our custom applications, from 2,500,000 to 4,000,000 FCFA (3,810 to 6,100 EUR) for a simple application and 4,000,000 to 7,000,000 FCFA (6,100 to 10,670 EUR) for a medium one, with maintenance from 35,000 FCFA per month.
Mini case study
Illustrative example: Sarah, CAO of a 30,000-resident municipality near Toronto. Customer service handles 1,400 calls a month, 35% of them about waste (bin requests, bulky pickup, calendars). The redesign adds 6 online services. If 40% of those requests move online, that is 196 calls avoided per month, at 6 minutes each, or about 20 staff hours saved monthly. At 45 CAD per loaded hour, the saving is 900 CAD per month, about 10,800 CAD per year, enough to cover the support contract.
Need a professional website?
Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.
FAQ
Can the redesign be awarded without a public posting?
Yes, if the total value (build plus support over the contract term) stays under your bylaw's direct purchase threshold, often 25,000 CAD. You still need to document the choice and collect at least 3 quotes.
Is full WCAG AA compliance achievable?
Yes for a new build, provided it is weighted at 15 to 20% in evaluation and an external audit is required. Legacy PDF documents remain the main source of non-compliance.
How long does the full project take?
Count 4 to 7 months: 1 to 2 months of procurement, 3 to 4 months of production and 1 month of testing and audit. A budget cycle or election period can add 2 months.
Should each department get its own site?
Not necessarily. A shared platform with department microsites often costs 30 to 40% less than separate sites and simplifies accessibility.
Which CMS should we choose?
Drupal and WordPress dominate the public sector in 2026. The key is avoiding a proprietary lock-in that makes exit costly at the next RFP, by requiring source code and content export.
Let's scope your project. Tell us your priority online services, your departments and your procurement timeline, and we will price the application modules with an indicative budget. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.
Mohamed Bah
Fondateur, Kolonell
Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.