Websites11 min read

Writing a council website tender specification with accessibility rules in London (2026)

Mohamed Bah·Fondateur, Kolonell
November 3, 2026
Share:
Writing a council website tender specification with accessibility rules in London (2026)

Writing a council website tender specification with accessibility rules in London (2026)

Websites

The verdict in three sentences

For a London council with 1,200 pages and dozens of service areas, a budget of £80,000 to £150,000 is realistic in 2026, as long as the specification prices the scope before bidders do it for you. WCAG 2.2 AA compliance under the Public Sector Bodies Accessibility Regulations must be verified by an independent audit at launch, otherwise it stays a sales promise. A 60 % quality, 40 % price evaluation, backed by structured method statements, filters out cheap bids that underestimate content migration.

What the specification must lock down

A council digital lead rarely starts from scratch. They inherit an ageing CMS, 1,200 pages of which a third are out of date, PDF forms and around forty content editors spread across departments. The specification has to turn that legacy into measurable requirements. A line like « modern, accessible website » produces incomparable bids and a stream of change requests.

Specification blockMeasurable requirementBudget share (2026 order of magnitude)
Discovery and information architectureAudit of 1,200 pages, target 700 after pruning£8,000 to £14,000
Design system12 page templates aligned with GOV.UK patterns£12,000 to £22,000
CMS and buildOpen source CMS, editor roles, approval workflow£28,000 to £50,000
Online services15 digital forms, GOV.UK Pay and CRM integration£12,000 to £22,000
Accessibility WCAG 2.2 AAIndependent audit of 20 pages, published statement£6,000 to £12,000
Content migration700 pages migrated, 301 redirects for every URL£9,000 to £18,000
Training and testing3 editor sessions, 4 weeks of user acceptance testing£5,000 to £12,000

The total lands between £80,000 and £150,000. Require a priced schedule that mirrors these lines exactly: you can compare bidders item by item and spot the one who allocates £2,000 to migration, a sign they have not understood it.

Procurement route, timeline and evaluation

Under the Procurement Act 2023, in force since February 2025, a contract of this size sits below the threshold for sub-central services (around £215,000 including VAT), but above £30,000 you still publish a below-threshold notice on the Find a Tender service. Many councils also use the G-Cloud framework, which shortens the process.

StageRecommended durationWatch point
Drafting specification and pricing schedule4 to 6 weeksValidate the target sitemap with service areas
Tender open35 daysHold a supplier Q&A session
Evaluation2 to 3 weeksPublished scoring guide with weighted sub-criteria
Clarification and presentations1 to 2 weeksTop 3 bidders only
Award and kick-off1 weekDiscovery workshop within 10 days
Delivery6 monthsPayment milestones tied to deliverables, not time

For quality (60 %), break down the sub-criteria: migration method (15 points), accessibility approach with evidence from public references (15 points), architecture and hosting (10 points), team and plan (10 points), exit and support (10 points). Price (40 %) is scored proportionally against the lowest compliant bid, after checking for abnormally low tenders.

On hosting, require UK or EU data residency, Cyber Essentials Plus certification and an exit clause: full export of content and accounts in open formats, free of charge, within 30 days.

Clauses that prevent change requests

Three topics drive most disputes in council rebuilds. First, migration: state who moves what and how many pages the supplier migrates. Second, accessibility: set a target (no critical WCAG failures at launch, 100 % of blocking issues fixed) and release the final payment after the independent audit. Third, support: price a 3-year support and maintenance contract separately, renewable annually, so its cost does not surprise you after launch.

Remember the legal duty: the council must publish an accessibility statement, and the Central Digital and Data Office monitors public sector sites and can escalate non-compliance to the Equality and Human Rights Commission.

Mini case study

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

You are :

Priya, head of digital at a London borough, receives 6 bids. The cheapest (£71,000) plans 3 days of migration for 700 pages, about 230 pages a day, which is unrealistic. A £112,000 bid plans 18 days of migration, an independent WCAG audit and UK hosting with Cyber Essentials Plus.

Scoring: the £71,000 bid gets 40 price points but only 31 quality points out of 60, total 71. The £112,000 bid gets 40 × 71,000 / 112,000 = 25.4 price points and 54 quality points, total 79.4. Priya awards the second. The avoided cost: an estimated £20,000 migration change request and 3 months of delay on online services.

FAQ

Should the specification name a specific CMS?

Better to set requirements (open source, roles, workflow, exit) than a brand. Naming a product narrows competition and can expose the procurement to challenge. Keep 10 quality points for the supplier's justification of their choice.

How long between drafting and launch?

Allow 10 to 12 months: 6 weeks of drafting, 35 days of tender, about a month of evaluation, then 6 months of delivery. A launch before a local election cycle means starting very early.

How do we check the accessibility actually delivered?

Commission a third-party audit on 20 representative pages and tie 10 to 15 % of the payment to its result. The supplier fixes blocking issues before acceptance.

Is G-Cloud better than an open tender?

G-Cloud can cut the procurement timeline to 6 to 8 weeks, but you are limited to listed suppliers and their published rates. An open tender takes longer and usually attracts more competitive pricing on a 6-month build.

What belongs in support and maintenance?

Security updates, fixes, backups, monitoring and 5 to 10 days of improvements per year. Require measured response times, for example 4 working hours for a blocking defect.

Let's scope your project. We help you structure the specification, pricing schedule and scoring guide, or we bid on your tender with a detailed 6-month plan. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#website tender specification#public procurement#WCAG 2.2#London council#Procurement Act 2023#council website budget 2026
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.