Websites11 min read

How Long to Build a Website? Real Timelines in Senegal in 2026

Mohamed Bah·Fondateur, Kolonell
July 31, 2026
Share:
How Long to Build a Website? Real Timelines in Senegal in 2026

How Long to Build a Website? Real Timelines in Senegal in 2026

Websites

The verdict in three sentences

Timeline depends mostly on project type: a few days for a landing page, a few weeks for a showcase site or store, a few months for a custom platform. The number-one cause of delay is almost never the developer: it is content and approvals on the client side, which stretch the schedule by 30 to 50%. A well-scoped project, with copy and photos ready at kickoff, ships at the low end of the range.

Timelines by site type in 2026

Realistic ranges from kickoff to go-live, with content delivered on time.

Site typeRealistic 2026 timelinePages / scope
Landing page3 to 7 days1 page, 1 goal
Showcase site2 to 4 weeks5 to 10 pages
E-commerce4 to 8 weekscatalog + payment
Marketplace8 to 14 weeksmulti-vendor
Custom platform8 to 16 weeksspecific features

The phase-by-phase schedule

Typical split of a showcase or e-commerce project, as a share of total time.

PhaseShare of timeExpected deliverable
Scoping & design20 – 25%Approved mockups, sitemap
Development35 – 40%Working site in staging
Content integration20 – 25%Copy, photos, products online
QA & testing10 – 15%Fixes, payment tested
Go-live5%Site in production, training

Causes of slippage and standard payment plan

Delays almost always share the same causes. Anticipate them with a clear payment schedule.

Cause of delayImpact on timelineCountermeasure
Content delivered late+30 to 50%Provide copy/photos at kickoff
Approval back-and-forth+1 to 2 weeksOne designated approver
Scope changes+2 to 4 weeksFrozen specification
Wave/OM payment testing+2 to 5 daysTest accounts ready

Standard 2026 plan: 30% deposit at start, 40% at staging approval, 30% at go-live.

Mini case study

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Ibrahim, a restaurant owner in Dakar, wants a showcase site with menu and booking. Quote at 450,000 FCFA, timeline stated at 3 weeks. He provides his photos and copy on day one and names his sister as sole approver. Result: delivery in 18 days, at the low end of the range. His neighbor, who sent content piecemeal over three weeks, got the same site in 5 weeks — that is 75% more time for an identical project.

FAQ

Why is my site taking longer than planned?

In 8 out of 10 cases it is content: copy, photos, logos and product sheets delivered late. That single factor adds 30 to 50% to the initial schedule.

Can a showcase site be delivered in one week?

A landing page yes (3 to 7 days). A true 5-to-10-page showcase site needs 2 to 4 weeks for design, development and QA.

How long for an e-commerce store with Wave and Orange Money?

Budget 4 to 8 weeks in 2026. Integrating and testing mobile payment adds 2 to 5 days of dedicated webhook QA.

How does project payment work?

Standard 30/40/30 plan: 30% at signature, 40% at staging approval, 30% at go-live. It aligns both sides' interests.

What happens if I change my mind mid-project?

A scope change adds 2 to 4 weeks and an amendment to the quote. Hence the importance of a frozen specification before development.

Let's talk about your project. We'll set a realistic timeline together with clear milestones and a controlled payment schedule. WhatsApp +221 77 596 93 33.

Tags:#website timeline#how long website#web project schedule#website delivery#web agency senegal#payment schedule#showcase#e-commerce
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.