The verdict in three sentences

For a ferry and freight operator in Amsterdam, a realistic website timeline in 2026 is 14 to 28 weeks, and the upper end is common as soon as you connect an existing booking engine and real time schedule feeds. The usual culprits are well known: the booking integration (3 to 8 weeks), the schedule and port status feed, and approval rounds with the board. If you want to be live before the summer booking peak, kick off no later than early October of the previous year.

The plan, phase by phase

Durations below are a 2026 market ballpark for a passenger and freight site of 40 to 70 pages in Dutch, English and German, with a booking engine already in production.

PhaseShort caseLong caseDeliverableSign-off
Discovery and workshops2 weeks3 weeksSitemap, passenger and freight journeys, integration specCommercial director and IT
UX and visual design2 weeks4 weeksRoute page, sailing search, freight quote templatesBoard
Site build3 weeks6 weeksCMS, route pages, freight formsDigital lead
Booking engine integration3 weeks8 weeksSailing search, fares, handoff to checkoutIT and booking vendor
Schedule and disruption feed2 weeks4 weeksLive departures, weather and delay noticesOperations
Content and translations2 weeks5 weeks3 languages reviewedCustomer service, freight desk
QA and launch2 weeks4 weeks20 to 30 journeys tested, redirectsProject team

Several phases overlap: integration starts during the build, translations run alongside technical QA. That is why the total is 14 weeks at best and 28 weeks when a vendor answers slowly, rather than the sum of each column.

What usually causes delays

Delay causeTypical slipHow to prevent it
Incomplete booking engine documentation2 to 6 weeksGet sandbox access during discovery
Schedule feed format not agreed1 to 3 weeksAgree on one feed format and owner before design
Board approval in 3 rounds instead of 22 to 4 weeksOne steering committee with fixed dates
German copy delivered late1 to 2 weeksOrder translations as soon as templates are approved
Freight terms and dangerous goods pages1 to 2 weeksName a freight content owner on day one
Accessibility fixes found late1 to 2 weeksTest against WCAG 2.1 AA from the first templates

Accessibility matters more than it used to: the European Accessibility Act applies to passenger transport services, including websites and booking flows, so check the Dutch implementation and your scope with counsel rather than relying on a checklist. Dangerous goods information for freight should be based on the official maritime rules and validated by your compliance team.

Backward schedule before the summer peak

MilestoneTarget date (24 week project)Safety margin
Kick-offEarly OctoberNone
Design approvedMid November1 week
Booking sandbox liveEarly December2 weeks
Content and translations finalEnd of January2 weeks
Full QAFebruary1 week
Go liveMid March2 weeks before the booking peak

As a benchmark, Kolonell's delivery times are public: a Premium site with booking in 21 to 30 working days, at 3,050 to 5,340 EUR (2,000,000 to 3,500,000 FCFA), plus 110 EUR per extra language. That covers the website; connecting to an existing booking engine is scoped and scheduled separately as a custom application.

Mini case study

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

You are :

Illustrative example: Daan, digital lead of an Amsterdam operator running freight and passenger services to the UK and Scandinavia, must give the board a go live date. He plans 24 weeks from 6 October, landing in mid March. His argument for protecting the schedule: the site takes about 900 passenger bookings a week in March at an average basket of 320 EUR. If a 4 week delay keeps the old mobile flow live and 8 % of visitors drop off, that is 288 bookings, about 92,000 EUR of revenue at risk. The board blocked the approval dates the same day.

FAQ

How long does a ferry company website take in 2026?

Plan 14 to 28 weeks depending on the booking engine and feeds. With a well documented engine and two approval rounds, 16 to 18 weeks is realistic.

When should we start to be ready for summer?

For a mid March launch, start in early October with a 24 week plan. Keep at least 2 weeks of margin before the booking peak.

Why does booking integration take so long?

It depends on the vendor's documentation, sandbox and responsiveness: 3 to 8 weeks is the usual range. Third party technical exchanges are the first source of slippage.

How many journeys should QA cover?

Between 20 and 30: foot passenger, car, cabin, group, freight quote, amendment, on desktop and mobile in three languages. Skipping journeys usually costs 1 to 2 weeks of post launch fixes.

Can we launch in two steps?

Yes: launch the content site with a link to the current booking flow, then the full integration 6 to 8 weeks later. This protects the season date.

Let's scope your project. Share your target date, languages and booking vendor, and we will build a phase by phase plan with an indicative budget and realistic margins. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#shipping company website#website timeline#web agency Amsterdam#web project planning#website design#delivery timelines#Amsterdam
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.