Digital Africa11 min read

Quantity Takeoff and Estimating Software for an Engineering Firm in Dubai (2026)

Mohamed Bah·Fondateur, Kolonell
October 9, 2026
Share:
Quantity Takeoff and Estimating Software for an Engineering Firm in Dubai (2026)

Quantity Takeoff and Estimating Software for an Engineering Firm in Dubai (2026)

Digital Africa

The verdict in three sentences

A consultancy pricing 70 projects a year in Excel works with rate schedules copied from file to file and unit rates that are sometimes two or three years old. Custom takeoff and estimating software at USD 25,000 to 58,000 (15 to 35 million FCFA) runs on an up-to-date local unit rate database, imports quantities from drawings and produces the bill of quantities automatically. Estimating time is cut in half, and above all the gap between BoQ and actual site cost shrinks, which protects the firm's credibility with clients.

Excel: where time and margin leak

In Dubai, as in Abidjan, prices of cement, rebar and aggregates moved 8 to 15 % between 2024 and 2026 depending on the product. An outdated rate schedule directly distorts bids, whether the firm works for a private developer, a public client or a main contractor.

Estimating stepIn ExcelWith the softwareTime saved
Takeoff from drawings2 to 4 days (manual)1 day (DWG or IFC import, checks)60 %
Structuring trades and items1 day2 h (templates per project type)75 %
Applying unit rates1 day, rates sometimes outdated1 h, dated and sourced database85 %
Rate build-upsRarely doneAutomatic labour, materials, plantNew
BoQ and rate schedule output4 h of formattingInstant PDF and Excel export90 %
Options (G+2 instead of G+3)Rebuild the fileDuplicate in 10 min95 %

Over 70 projects, the firm goes from about 6 days to 3 days per estimate, freeing 210 engineer-days a year.

2026 budget

ModuleContentBudget (2026 order of magnitude)Duration
Unit rate database1,500 items, build-ups, local price historyUSD 8,300 (5,000,000 FCFA)6 weeks
TakeoffStructured entry by trade, Excel importUSD 6,700 (4,000,000 FCFA)5 weeks
Drawing importIFC or DWG quantity extractionUSD 13,300 (8,000,000 FCFA)8 weeks
Automatic BoQ and rate schedulePublic and private client templatesUSD 5,000 (3,000,000 FCFA)3 weeks
Variance trackingBoQ vs site valuationsUSD 10,000 (6,000,000 FCFA)6 weeks
Management dashboardBid win rate, margin per projectUSD 6,700 (4,000,000 FCFA)4 weeks
Annual maintenanceHosting, updates, supportUSD 3,000 to 5,800Ongoing

A first package (rate database, takeoff, BoQ) starts at USD 25,000. The full version with drawing import and variance tracking reaches USD 50,000 to 58,000.

Custom or off-the-shelf?

CriterionImported estimating softwareKolonell custom build
LicenceEUR 2,500 to 6,000 per seat per year (USD 2,700 to 6,500)No per-seat licence
Local rate schedulesBuild them yourselfLocal database delivered and updatable
Public tender BoQ formatsManual adjustmentBuilt-in templates
Language and unitsOften designed for one marketBilingual, local units and trades
5-year cost, 6 seatsUSD 81,000 to 195,000USD 40,000 to 87,000

Mini case study

Omar, technical director of an 18-person engineering consultancy in Dubai, prices 70 projects a year. A cost engineer costs about USD 7,500 a month, or USD 340 a day. The 210 days freed are worth USD 71,400 a year. With a USD 42,000 project and USD 4,200 maintenance, the net annual gain is USD 67,200: payback in about 8 months. In Abidjan, with lower salaries (55,000 FCFA a day), the same logic gives a payback under 12 months once the freed time is used to bid on 15 more tenders.

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

FAQ

Do we need BIM models to use drawing import?

No, import works with IFC files but also with layer-structured DWG drawings. Without usable drawings, structured takeoff entry is still 2 times faster than Excel.

Who updates the rate database?

The firm, through a simple interface with full price history. A quarterly update of the 200 most-used items can be included in maintenance.

Does it produce the formats required in public tenders?

Yes, BoQ and rate schedule templates are configured to match your clients' standard tender documents, with PDF and Excel export.

How many users can work at once?

There is no per-seat limit. An 18-person firm can run 6 estimators at once with no licence cost.

How is the project paid?

In three instalments: 30 % at scoping, 40 % at acceptance, 30 % at go-live. Bank transfer, card, or Wave and Orange Money in West Africa.

Let's scope your project. Send us a sample BoQ, your annual project count and drawing formats: we will price a first package between USD 25,000 and 58,000, delivered in 3 to 6 months. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#engineering consultancy#quantity takeoff#estimating#bill of quantities#Dubai#pricing