The verdict in three sentences
For a port authority or maritime operator in Singapore, a corporate website of 60 to 90 pages with vessel call tracking and a press room costs 180,000 to 350,000 SGD in 2026 (about 125,000 to 245,000 EUR), excluding ongoing support. The quality of the tender depends on three requirements written in plain terms: a 3-level editorial workflow, WCAG 2.1 AA accessibility and a contractual 99.9 % availability. Ongoing application support typically runs 8,000 to 14,000 SGD per month.
What the tender specification must cover
A port website is not a brochure. It serves shipping lines, freight forwarders, investors, media, job seekers and the public. The specification should describe journeys by audience rather than a flat list of pages.
Expected modules in 2026: corporate profile and governance, a vessel arrivals and departures board fed by the port community system, downloadable tariffs and regulations, a press room with releases and a media library, procurement notices, careers, annual traffic statistics, and a contact form routed by department.
The most underestimated item is vessel call integration. The specification must state the source (API, scheduled export or manual entry), the refresh frequency (every 15 minutes is a reasonable standard) and the expected behaviour if the source goes down.
2026 budget grid by scope
| Scope | Pages | Key features | Indicative budget |
|---|---|---|---|
| Corporate core | 60 | bilingual, press room, careers, headless CMS | 180,000 to 215,000 SGD |
| Core + vessel calls | 70 | 15-minute API refresh, vessel search | 230,000 to 265,000 SGD |
| Core + calls + procurement | 80 | tender notices, archives | 265,000 to 305,000 SGD |
| Full scope | 90 | interactive statistics, partner portal | 305,000 to 350,000 SGD |
| Monthly application support | n/a | fixes, security, minor changes | 8,000 to 14,000 SGD/month |
| High-availability hosting | n/a | CDN, 24/7 monitoring, backups | 1,500 to 3,000 SGD/month |
These are 2026 orders of magnitude for vendors able to deliver at this level. A bid below 120,000 SGD for the full scope should prompt questions from the evaluation panel.
Technical requirements and scoring criteria
| Requirement | Expected level | How to verify |
|---|---|---|
| Editorial workflow | 3 levels: author, department approver, corporate comms publisher | live demo at presentation |
| Accessibility | WCAG 2.1 AA, audit report supplied | audit before acceptance |
| Availability | 99.9 %, under 8 h 46 of downtime per year | SLA clause with service credits |
| Performance | LCP under 2.5 s on mobile | Lighthouse at acceptance |
| Security | CSP headers, WAF, penetration test | pentest report, alignment with IM8 where applicable |
| Personal data | PDPA compliance | data inventory and DPO sign-off |
| Reversibility | source code and content handed over | contractual clause |
For scoring, a 60 % technical / 40 % price weighting is common in Singapore public and statutory board tenders. Within the technical score we suggest: understanding of requirements 15 %, architecture and security 15 %, port or public sector references 10 %, methodology and schedule 10 %, dedicated team 10 %.
A realistic timeline is 5 to 7 months: 1 month of discovery, 1 of design, 3 of development and integrations, 1 of testing, accessibility audit and content migration.
Mini case study
Need a professional website?
Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.
Daniel, head of corporate communications at a maritime operator in Singapore, sees around 40 calls and emails a day from forwarders asking for vessel arrival times. Each request takes an officer about 6 minutes, so 4 hours a day.
With an online vessel board refreshed every 15 minutes, the goal is to cut those requests by 60 %. Saving: 4 h × 60 % × 22 days = about 53 hours per month, a third of a full-time role. Valued at 45 SGD per hour, that is roughly 2,400 SGD per month, which covers most of the high-availability hosting bill on its own.
FAQ
What budget should a port authority plan for a corporate website in Singapore?
Between 180,000 and 350,000 SGD depending on scope, for 60 to 90 pages. Add 8,000 to 14,000 SGD per month for support and hosting on top.
Why require a 3-level editorial workflow?
A port authority publishes binding information such as tariffs, regulations and notices. Three approval levels prevent content from going live without sign-off from the responsible department.
What does 99.9 % availability mean in practice?
It allows at most 8 h 46 of downtime per year. The contract should define measurement, exclusions and service credits, for example 5 % of the monthly fee per hour exceeded.
Which CMS suits a port website?
A headless CMS such as Sanity or Strapi with a Next.js front end handles multilingual content, approval workflows and performance well. Drupal remains credible if the in-house team already runs it.
How long does the project take?
Allow 5 to 7 months from contract award to launch, including about 1 month of testing and accessibility audit.
Let's scope your project. Share your draft specification or module list and we will return a lot-by-lot estimate, a 5 to 7 month plan and a support proposal. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.
Mohamed Bah
Fondateur, Kolonell
Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.

