Websites11 min read

Corporate Website RFP for an Industrial Group in Berlin: Budget and Timeline 2026

Mohamed Bah·Fondateur, Kolonell
October 10, 2026
Share:
Corporate Website RFP for an Industrial Group in Berlin: Budget and Timeline 2026

Corporate Website RFP for an Industrial Group in Berlin: Budget and Timeline 2026

Websites

The verdict in three sentences

For a Berlin-based industrial group with 600 staff and 3 subsidiaries, a serious corporate redesign costs between €60,000 and €150,000 and takes 12 to 20 weeks from kickoff to launch. The RFP drives 80 % of the quality of the bids you receive: page scope, languages, headless CMS, EU hosting, accessibility under the Barrierefreiheitsstärkungsgesetz (BFSG) and an explicit scoring grid. A vague document attracts quotes that vary by a factor of 4 and cannot be compared.

What the RFP must contain

A head of communications writing the document alone often forgets the technical sections IT will later impose. Here are the essential sections and their budget impact.

SectionExpected contentBudget impactCommon mistake
Context and goalsGroup brand, subsidiaries, audiences (clients, candidates, investors)None directlyUnmeasurable goals
Sitemap25 to 60 pages, templates, subsidiary pages€1,200 to €2,500 per templateConfusing pages with templates
LanguagesDE, EN, plus FR or PL depending on markets+15 to 25 % per languageForgetting translation cost
Headless CMSSanity, Strapi or Contentful, editor roles per subsidiary€10,000 to €25,000No approval workflow defined
HostingEU, CDN, 99.9 % uptime, backups€3,000 to €9,000 per yearNon-EU hosting not disclosed
AccessibilityBFSG and WCAG 2.1 AA, audit included€5,000 to €12,000Requiring AA with no audit budget
SecurityCSP headers, internal SSO, penetration test€4,000 to €10,000No pen test planned
ReversibilitySource code, exportable content, documentationIncluded if requiredAgency lock-in

Budget and timeline by scope

The three scenarios below cover most industrial group tenders in Berlin and Brandenburg in 2026.

ScenarioPagesLanguagesBudgetDurationTypical agency team
Lean corporate25 to 302€60,000 to €80,00012 weeksProject lead, designer, 2 developers
Group and subsidiaries35 to 453€85,000 to €115,00014 to 16 weeks+ CMS integrator, copywriter
Group, subsidiaries and careers50 to 603€115,000 to €150,00018 to 20 weeks+ accessibility specialist, SEO
Investor portal option5 to 82+€12,000 to €22,000+3 weeksSenior developer
Technical product catalogue option100 to 500 sheets3+€18,000 to €35,000+4 weeksPIM data integrator
Annual maintenanceallall€10,000 to €22,000 per yearongoingSupport team

A typical plan breaks down as: 2 weeks of scoping, 3 to 4 weeks of design, 5 to 8 weeks of development, 2 weeks of testing and audit, 1 week of launch. Acceptance testing by the three subsidiaries is often the bottleneck: book review slots as soon as the contract is signed.

The 40 / 30 / 30 scoring grid

A weighting of 40 % technical, 30 % price, 30 % references prevents choosing the lowest bidder by default. Break the technical score into sub-criteria: understanding of the brief (10 points), architecture and CMS (10), accessibility and security (10), methodology and plan (10). Ask bidders for one key page mock-up or a 2 hour workshop rather than unpaid full designs. Limit the tender to 4 or 5 agencies to keep the exchanges meaningful.

Mini case study

Jonas, head of communications at a precision engineering group in Berlin, received five bids in 2025 ranging from €38,000 to €160,000 for a 4 page brief. In 2026 he rewrites it: 42 pages, 3 languages, headless CMS, BFSG and WCAG AA, 40/30/30 grid. The new bids narrow to €92,000 to €118,000. He picks an agency at €104,000 with a technical score of 36/40. By avoiding the €25,000 change order an incomplete low bid would have triggered, and cutting bid comparison time from 6 working days to 2, he secures both budget and the 16 week schedule.

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

You are :

FAQ

What budget should an industrial group plan for a corporate website in 2026?

Between €60,000 and €150,000 depending on pages (25 to 60), languages and options. Add €10,000 to €22,000 per year for maintenance and hosting.

How long does the project take?

Plan 12 to 20 weeks, excluding RFP writing. The tender itself adds 4 to 6 weeks between release and award.

Why require a headless CMS?

It lets several subsidiaries edit with separate rights and an approval workflow. It also improves performance, with load times often under 2 seconds.

Does the BFSG apply to our corporate site?

Since June 2025 it applies mainly to B2C digital services, but large groups increasingly require WCAG 2.1 AA across all sites. Budget €5,000 to €12,000 for an independent audit.

How many agencies should we invite?

Four to five agencies are enough. Beyond that, response quality drops and analysis time exceeds 5 days.

Let's scope your project. We help you define scope, languages and CMS for your corporate website, with an indicative budget of €60,000 to €150,000 and a 12 to 20 week timeline. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#cahier des charges site institutionnel#site groupe industriel#appel d'offres site web#refonte site Grenoble#corporate website RFP#industrial website Berlin
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.