Websites12 min read

Drupal to Next.js migration for a private college in Toronto: 2026 cost

Mohamed Bah·Fondateur, Kolonell
October 27, 2026
Share:
Drupal to Next.js migration for a private college in Toronto: 2026 cost

Drupal to Next.js migration for a private college in Toronto: 2026 cost

Websites

The verdict in three sentences

For a private college in Toronto still on Drupal 7, which no longer receives official support, a headless Next.js migration costs 35,000 to 70,000 CAD for 600 pages and 40 programs, including content transfer, 301 redirects and AODA accessibility compliance. The upper range includes a filterable program finder and a deeper content clean-up. The most visible benefit is speed: 40 to 60 % faster LCP, which directly affects information requests during the application season.

Why staying on Drupal 7 is now a risk

Drupal 7 has not received official security fixes since January 2025. Contributed modules are abandoned, hosts often force outdated PHP versions and every new feature becomes expensive. For a college collecting applicant data, it is also a privacy issue under PIPEDA and Ontario rules. The three realistic paths are an upgrade to Drupal 10 or 11, a move to another monolithic CMS, or a headless architecture where the CMS only serves content and Next.js handles the front end.

OptionIndicative cost (CAD)TimelineStrengthsLimits
Extend Drupal 7 (paid extended support)5,000 to 10,000 per yearimmediateNo projectGrowing technical debt
Upgrade to Drupal 10 or 1130,000 to 50,00010 to 14 weeksTeam already trainedNear-complete theme rebuild
Monolithic WordPress25,000 to 40,0008 to 12 weeksLarge ecosystemPerformance and security to watch
Headless (Strapi, Sanity or headless Drupal) + Next.js35,000 to 55,00012 to 16 weeksSpeed, security, scalabilityFront-end skills required
Headless + filterable program finder45,000 to 70,00014 to 16 weeksOptimised applicant journeyHighest budget

Budget breakdown of a headless migration

The figures below are 2026 orders of magnitude for a Toronto agency or specialised studio on a 600-page site with 40 program pages. For comparison, the same scope costs 18,000 to 28,000 EUR excl. VAT in Strasbourg, France.

Work packageContentPrice (CAD)
Audit and mappingInventory of 600 pages, obsolete content, redirect plan4,000 to 7,000
Content modellingTypes: program, news, faculty, event4,000 to 6,000
Migration scriptDrupal export, clean-up, import into the new CMS6,000 to 10,000
Next.js developmentTemplates, navigation, search, forms13,000 to 20,000
301 redirects and SEO600 to 900 URLs, tags, sitemap3,000 to 5,000
AODA and WCAG 2.0 AAAudit and fixes4,000 to 7,000
Filterable program finder (option)Credential, schedule, co-op, campus9,000 to 15,000
Hosting and maintenanceCDN, backups, updates250 to 600 per month

What an IT director measures after the switch

A headless move is judged on simple indicators recorded before launch and three months after. On this type of project, observed gains are 40 to 60 % on mobile LCP, a lower bounce rate on program pages and more information requests when the finder lets applicants reach a program in two clicks.

IndicatorDrupal 7 (typical)Headless Next.js (target)
Mobile LCP3.8 to 5 s1.6 to 2.4 s
Lighthouse performance score35 to 5585 to 98
Program page bounce rate60 to 70 %40 to 50 %
Time to publish a news item15 to 30 min5 min
Security alerts per year2 to 4close to 0

Mini case study

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

You are :

David, IT director at a private college of 2,500 students in Toronto, runs a 600-page Drupal 7 site that generates 900 information requests per year. He invests 62,000 CAD in a headless migration with a program finder and AODA audit, plus 450 CAD per month for maintenance. LCP drops from 4.4 to 2.0 seconds, a 55 % gain, and information requests rise 18 % the next season, 162 more requests. With an 8 % conversion to enrolment and 18,000 CAD in annual tuition, that is about 13 enrolments and 234,000 CAD in first-year revenue.

FAQ

How long does the migration take?

Plan 12 to 16 weeks for 600 pages. Avoid switching during the peak application window, typically January to March for fall intake.

Will we lose search rankings?

Not if every old URL gets a 301 redirect and metadata is carried over. A temporary 5 to 10 % traffic dip over 4 to 6 weeks is possible.

Is AODA compliance mandatory for a private college?

Ontario organisations with 50 or more employees must meet WCAG 2.0 AA on their public websites. The audit and fixes cost 4,000 to 7,000 CAD and are best built into the migration.

Do we need to migrate everything?

No. The audit usually reveals 30 to 40 % of obsolete pages to delete or merge, which lowers migration cost.

Let's scope your project. A headless migration of 400 to 800 pages with a program finder, indicative budget of 35,000 to 70,000 CAD depending on scope and AODA work, live in 12 to 16 weeks. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#Drupal migration#Next.js#Toronto#college website#migration cost 2026#headless CMS
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.