The verdict in three sentences
In Dubai, rising commercial tariffs and ESG reporting have made rooftop solar an investment decision for warehouses, hotels and clinics, and these buyers compare installers on evidence, not promises. The effective site in 2026 combines a savings calculator based on the DEWA bill, project references stated in kWp and sector pages; local agencies quote 40,000 to 110,000 AED for it, while Kolonell's Growth tier costs 1,830 to 3,050 EUR (1,200,000 to 2,000,000 FCFA). Add monthly SEO from 150 EUR to capture local searches, and plan 5 to 7 weeks of delivery.
Speak to each industrial client in their own terms
A logistics manager, a hotel general manager and a clinic administrator do not share the same pain point. The site should give each a page with a quantified argument and comparable references. Figures below are 2026 orders of magnitude for the UAE, to be refined by audit.
| Target | Main pain point | Quantified argument to highlight | Typical project size |
|---|---|---|---|
| Warehouse, logistics | Cooling and lighting loads on large roofs | Grid tariff around 0.30 to 0.45 AED/kWh including fuel surcharge vs 0.12 to 0.18 AED/kWh solar | 200 to 1,000 kWp |
| Hotel | Round-the-clock air conditioning | 15 to 30% lower electricity bill | 100 to 400 kWp |
| Clinic, laboratory | Continuity of care, cold chain | Backup with 2 to 6 h of storage | 50 to 200 kWp |
| Private school, university | Summer peak bills | Savings over the academic year plus ESG reporting | 50 to 300 kWp |
| Factory | Process loads, sustainability targets | Payback in 4 to 7 years | 300 to 2,000 kWp |
Each project reference should state installed capacity in kWp, storage in kWh, sector, commissioning date and, if the client agrees, measured savings. A photo gallery without numbers will not convince a CFO.
The savings calculator: the centrepiece
The visitor enters the monthly DEWA bill, roof area and operating hours. The calculator returns a recommended capacity, estimated annual savings and payback period, then asks for an email or WhatsApp number to send the detailed study. In the Growth tier it runs on a fixed formula you validate; a calculator fed by irradiance data per location is a custom application, from 3,810 to 6,100 EUR.
| Item | Dubai agency (estimate) | Kolonell | Frequency |
|---|---|---|---|
| Brochure site, 5 pages, no calculator | 15,000 to 35,000 AED | 1,220 to 1,830 EUR (Starter) | One-off |
| Sector pages, kWp references, simple calculator, blog | 40,000 to 110,000 AED | 1,830 to 3,050 EUR (Growth) | One-off |
| Advanced SEO, animations, extended content | 110,000 AED and up | 3,050 to 5,340 EUR (Premium) | One-off |
| Advanced calculator (custom application) | 30,000 to 80,000 AED | 3,810 to 6,100 EUR | One-off |
| Monthly SEO | 4,000 to 12,000 AED | 150, 300 or 530 EUR | Monthly |
| Maintenance | 800 to 3,000 AED | 50, 110 or 180 EUR | Monthly |
| Google or Meta Ads campaign setup | 2,000 to 6,000 AED | 150 EUR | One-off |
Kolonell amounts come from the 11/10/2026 price grid. Search details are on the monthly SEO page.
Mini case study
Rashid, managing director of a 20-person C&I solar installer in Dubai (illustrative persona), wins projects mainly through EPC partners. He picks a Growth site at 2,740 EUR, SEO Essentiel and Standard maintenance.
- First-year cost: 2,740 + 12 × 150 + 12 × 110 = 5,860 EUR, roughly 23,500 AED.
- A single 300 kWp warehouse project at about 2.2 AED per installed Wp represents 660,000 AED of revenue.
- At a 15% margin, that project yields 99,000 AED, about four times the first-year cost.
- If the site generates 15 qualified enquiries a month and 2% convert, that is 3 to 4 projects a year.
Need a professional website?
Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.
The key risk is responsiveness: an enquiry from the calculator needs an answer within 24 h, or the client calls a competitor.
FAQ
How much does a commercial solar installer website cost in Dubai in 2026?
Local agencies typically quote 40,000 to 110,000 AED for sector pages, references and a calculator. Kolonell's Growth tier covers that core scope for 1,830 to 3,050 EUR, and a 5-page brochure site starts at 1,220 EUR.
Is the calculator reliable?
It gives an estimate based on your sizing formula, with a stated margin of error of around 20%. A technical site survey remains essential before any firm offer.
How long to rank on Google in Dubai?
As an order of magnitude, 3 to 6 months of monthly SEO to rank for queries such as commercial solar installer Dubai or rooftop solar for warehouses UAE, a more competitive market than most.
What is the delivery time?
From 5 to 7 weeks depending on how quickly project references and photos are available. Reference sheets in kWp are often the slowest content to gather.
Can we also target Abu Dhabi or Riyadh?
Yes, with country or emirate pages and arguments adapted to local tariffs and regulations. That is usually a move from Growth to Premium, between 3,050 and 5,340 EUR.
Let's scope your project. Share your target sectors, kWp references and service area, and we will price a Growth site with a savings calculator, indicative budget 1,830 to 3,050 EUR, delivered in 5 to 7 weeks. Detailed quote within 48 h via our form. WhatsApp +221 77 596 93 33.
Mohamed Bah
Fondateur, Kolonell
Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.