The verdict in three sentences
For a building inspection firm overseeing 120 projects a year, a website with a client portal costs 3,000,000 to 6,500,000 FCFA (about EUR 4,600 to 9,900) in 2026 in West Africa, a scope that New York firms can use as a benchmark against local agency quotes. The module that justifies the spend is publishing visit reports and open defects online, so developers, banks and public owners can check them without phone chasing. Plan 8 to 12 weeks and maintenance of 50,000 to 110,000 FCFA a month to keep the platform secure and current.
Why an inspection firm needs a real client area
An inspection firm sells trust. Developers want to see your accreditations before signing, banks want proof that the project they fund is progressing without blocking defects, and public projects require a traceable visit history. A brochure site alone only covers the first need.
| Project component | 2026 range (FCFA) | Role |
|---|---|---|
| Scoping, sitemap, workshops with engineers | 300,000 to 600,000 | Define report types and rights |
| Design and public site (services, references, team) | 700,000 to 1,400,000 | Credibility with developers |
| Accreditation and certification pages | 200,000 to 400,000 | Proof of compliance, downloadable documents |
| Owner portal (accounts, projects) | 900,000 to 2,000,000 | Secure access per project |
| Visit reports and defect tracking | 600,000 to 1,500,000 | Open or closed status, photos, dates |
| E-mail and SMS notifications | 150,000 to 300,000 | Owner alerted after every visit |
| Testing, training, go-live | 150,000 to 300,000 | Team autonomous from launch |
| Total | 3,000,000 to 6,500,000 |
The low end covers a polished public site and an area where PDF reports are filed per project. The high end covers structured defect tracking with status, geotagged photos and history.
Three project levels by volume
| Level | Budget (FCFA) | Scope | Timeline |
|---|---|---|---|
| Essential | 3,000,000 to 3,800,000 | Public site, accreditations, PDF reports per project | 8 weeks |
| Advanced | 3,800,000 to 5,200,000 | + defect tracking, notifications, multiple accounts per project | 10 weeks |
| Complete | 5,200,000 to 6,500,000 | + bank dashboard, history export, mobile field access | 12 weeks |
With 120 projects a year, the Advanced level is often the right balance: it stops you answering the same "have the defects been cleared?" question ten times a week.
Maintenance and document security
Reports hold sensitive information: structural defects, delays, contractor names. Access must be partitioned per project and logged.
| Maintenance plan | Monthly cost (FCFA) | Scope |
|---|---|---|
| Base | 50,000 | Updates, backups, uptime monitoring |
| Standard | 80,000 | + small changes, support within 48 h |
| Enhanced | 110,000 | + priority support, access review, monthly report |
Hosting must include a daily backup. A lost report can cost far more than a year of maintenance if a dispute arises on a building.
Mini case study
Need a professional website?
Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.
Mr. Ouédraogo runs an inspection firm in Ouagadougou that oversees 120 projects a year. His two assistants each spend about 5 hours a week sending reports and answering developer and bank follow-ups, 10 hours a week in total. At a loaded hourly cost of about 3,500 FCFA, that is 35,000 FCFA a week, close to 1,680,000 FCFA over 48 weeks. An Advanced project at 4,500,000 FCFA, plus 80,000 FCFA monthly maintenance (960,000 FCFA a year), pays back in under two and a half years on that line alone. The commercial gain comes on top: a credible client portal carries weight in public tenders.
FAQ
What budget for an inspection firm website without a client area?
A public site with services, references and accreditations runs about 1,200,000 to 2,400,000 FCFA. It does not solve report follow-up, which is often more than half of admin time.
Can banks have separate access?
Yes. Each project can have several accounts with different rights: the owner sees everything, the bank only sees progress and blocking defects. This setup is part of the Advanced level.
Can engineers upload a report from the site?
Yes, with the Complete level the mobile interface lets them upload a report and photos in under 5 minutes, even on an unstable 3G connection.
How long until the site is live?
From 8 weeks for Essential to 12 weeks for Complete. Collecting accreditations and references often takes 2 weeks on its own.
Can we pay in instalments?
The usual schedule is 40% on order, 40% at acceptance testing and 20% at go-live. Maintenance starts the month after launch.
Let's scope your project. Tell us your project volume, client types and the reports to publish, and we will price the site and owner portal with a precise schedule. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.
Mohamed Bah
Fondateur, Kolonell
Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.