Websites11 min read

Solar EPC Company Website Cost in London (2026)

Mohamed Bah·Fondateur, Kolonell
October 5, 2026
Share:
Solar EPC Company Website Cost in London (2026)

Solar EPC Company Website Cost in London (2026)

Websites

The verdict in three sentences

A solar EPC company website in London costs between 15,000 and 40,000 GBP in 2026, delivered in 6 to 8 weeks. Against an average ticket of 350,000 to 450,000 GBP for a 500 kWp commercial rooftop, the margin on one project won through the site covers it almost twice over. The three things that get a facilities or finance director to sign are a savings calculator, quantified case studies and proof of financial strength.

What a plant manager or hotel CFO expects

The buyer compares a non-domestic electricity rate of roughly 22 to 28 pence per kWh (2026 estimate) with a solar levelized cost around 7 to 10 pence per kWh. Your website must make that calculation obvious and credible.

Page or featureCommercial goalKey contentIndicative cost (GBP)
ROI-led home pageGrab the CFO's attentionMWp installed, cumulative savings, client logosIncluded
Savings calculatorGenerate a qualified leadAnnual bill, roof area, estimated capacity, payback4,000-9,000
Case study pagesProve track recordCapacity (kWp), annual yield, savings, drone photos2,000-4,000
Sector solution pagesSpeak to each targetManufacturing, logistics, hospitality, healthcare2,500-5,000
Funding optionsRemove the budget objectionPurchase, lease, PPA, zero-capex models1,500-3,000
Investor and accreditation sectionReassure funds and tier-one clientsMCS, NICEIC, ISO 9001, financials1,500-3,500
Live generation dashboard (option)Retain and upsellClient portal connected to inverters8,000-18,000

Three budget levels

PackageScopePrice (GBP)TimelineMaintenance per month
Essential10-12 pages, case studies, survey request form15,000-20,0006 weeks400
Growth+ savings calculator, sector pages, blog22,000-30,0007 weeks600
Premium+ funding options, investor section, CRM, advanced SEO31,000-40,0008 weeks800-1,200
Template site (comparison)Theme, no calculator4,000-8,0003 weeks150
Large London agency (comparison)Same scope as Premium60,000-120,00012-16 weeks2,500 and up

The calculator remains the best-performing investment: on installer websites it typically drives 40 to 60 % of survey requests (2026 estimate), with pre-qualified data such as consumption, roof area and location.

SEO and tenders

Queries like "commercial solar installer London" or "solar PPA for warehouses UK" are competitive but winnable with sector content. Two articles a month on Smart Export Guarantee rates, business rates relief and case studies typically build rankings in 6 to 9 months. Procurement teams and funds check your references online before shortlisting you for frameworks.

Mini case study

James, sales director at a London solar EPC contractor (100 kWp to 5 MWp systems), invests 26,000 GBP in a Growth site plus 600 GBP a month, or 33,200 GBP in year one. The calculator generates 12 qualified survey requests a month. At a 3 % conversion rate, that is about 4 projects a year. A single 500 kWp project at 400,000 GBP with a 15 % gross margin brings in 60,000 GBP, almost twice the annual cost of the site.

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

FAQ

Does the calculator need to be very precise?

No, it needs to be credible. An estimate within plus or minus 15 % is enough to trigger a survey request, precision comes from the site visit.

Can we show live generation from our installations?

Yes, through inverter APIs (SMA, SolarEdge, Huawei). Budget 8,000 to 18,000 GBP depending on the number of connected sites.

Should we name our clients?

With written consent, yes. Otherwise, "food manufacturer, Essex, 750 kWp" remains very convincing.

How fast will the site load?

We target under 2 seconds on mobile, with WebP images and Core Web Vitals in the green.

What does a French version add?

For EPCs bidding on African or European projects, a second language costs about 3,000 to 6,000 GBP depending on page count, professional translation and SEO included.

Let's scope your project. Send us your 5 best case studies and priority sectors, and we will price a website between 15,000 and 40,000 GBP, delivered in 6 to 8 weeks. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#site énergie solaire#site EPC Dakar#simulateur économies#prix site Sénégal#références centrales#solar company website London
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.