Websites10 min read

Redesign or Rebuild? Website Decision Guide for Manufacturing SMBs in Berlin

Mohamed Bah·Fondateur, Kolonell
October 15, 2026
Share:
Redesign or Rebuild? Website Decision Guide for Manufacturing SMBs in Berlin

Redesign or Rebuild? Website Decision Guide for Manufacturing SMBs in Berlin

Websites

The verdict in three sentences

For a manufacturing SMB in Berlin whose website dates from 2018, a redesign at €9,000-15,000 (ex. VAT) is the right call if the technical foundation still holds and the catalogue is already structured. A new site at €16,000-30,000 is justified as soon as the 300-item technical catalogue must become filterable, multilingual or connected to the ERP. Either way, without a redirect plan, you risk losing 20 to 60% of SEO traffic within weeks.

The decision grid in seven criteria

The sales director of an 80-employee precision engineering firm does not need an agency's opinion; they need verifiable criteria. Score your current site on each one.

CriterionLean towards redesign if...Lean towards a new site if...
Tech foundationMaintained CMS, PHP 8.x compatibleAbandoned CMS or locked proprietary theme
Catalogue300 items already in a database, structured pagesData sheets as PDFs, no usable data
Mobile performanceLCP between 2.5 and 4 sLCP above 5 s, not responsive
Organic trafficOver 1,500 visits/month and growingUnder 300 visits/month
LanguagesGerman alone is enoughExport: EN and FR required
IntegrationsSimple formsERP link, configurator, distributor portal
Brand imageRecent brand guidelinesRepositioning or new offer

If you tick four or more criteria in the right-hand column, a redesign will make you pay twice: once now, once again in two years.

Comparing budgets, timelines and risks

ItemRedesignNew site
Build budget ex. VAT 2026€9,000 to €15,000€16,000 to €30,000
Timeline10 to 12 weeks12 to 14 weeks
300-item catalogueMigration and clean-up of product pagesData model, technical filters, generated PDF sheets
Multilingual DE/EN/FR+ €2,500 to €4,000Built into the architecture (+ €3,000 to €5,000 translation)
301 redirect plan€800 to €1,500€1,500 to €2,500
Traffic loss without redirects20 to 35%40 to 60%
Monthly maintenance€120 to €200€180 to €350
Estimated lifespan3 years5 to 6 years

Per year, a €12,000 redesign over 3 years costs about €4,000 a year, and a €24,000 new site over 5.5 years about €4,360 a year. The yearly gap is small; what decides is the site's ability to generate qualified quote requests.

Protecting SEO during the switch

Migration is where manufacturing SMBs lose the most. The essential steps: export every indexed URL (Search Console and a crawl), a one-to-one mapping table for the 300 product pages, 301 redirects tested on a staging environment, keeping high-performing title tags, then weekly monitoring for 8 weeks. A proper plan costs under €2,500; a 40% traffic drop on a site that brings in 15 quote requests a month costs far more.

Mini case study

Katrin, sales director of an 80-employee precision engineering firm in Berlin, receives 12 web quote requests a month, 25% of which turn into orders worth €8,500 on average. Her 2018 site lists items as PDFs. She opts for a new site at €24,000 with a filterable DE/EN/FR catalogue. After six months, requests rise to 18 a month. Gain: 6 × 25% × €8,500 = €12,750 of additional orders per month. Even at a 30% gross margin, the project pays back in just over six months.

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

You are :

FAQ

Can we redesign only the look and keep the CMS?

Yes, if the CMS is maintained and PHP 8.x compatible. Expect €9,000 to €12,000, but the catalogue will stay limited to what the current database allows.

How much does putting the 300-item catalogue online cost?

Between €3,000 and €7,000 depending on source data quality. If specifications live in the ERP, an automated import saves weeks of data entry.

Should the site be multilingual from day one?

If more than 15% of revenue comes from export, yes. Planning a DE/EN/FR architecture in the build costs half as much as adding it later.

How much time must the company commit?

About 25 to 40 hours over 12 weeks: workshops, sign-off on technical sheets and acceptance testing. Appoint a single internal owner.

Does traffic always drop after a migration?

A 5 to 10% dip for 2 to 4 weeks is normal. Beyond 20%, the redirect plan is at fault and must be fixed immediately.

Let's scope your project. Send us your current site URL, your catalogue size and a budget between €9,000 and €30,000, and we will recommend redesign or rebuild with a 10 to 14 week plan. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#manufacturing website redesign#SMB website Berlin#redesign or rebuild#online technical catalogue#SEO migration#web agency Berlin
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.