Websites11 min read

Realistic timeline for a space qualification test lab website in London in 2026

Mohamed Bah·Fondateur, Kolonell
October 11, 2026
Share:
Realistic timeline for a space qualification test lab website in London in 2026

Realistic timeline for a space qualification test lab website in London in 2026

Websites

The verdict in three sentences

For a London lab qualifying spacecraft equipment, a website rebuild takes 10 to 20 weeks on the market, and the schedule almost always slips on technical content and export control review, far more than on development. Budget 13,000 to 42,000 GBP (2026 market ballpark). A credible plan books 2 to 5 weeks of review by your test engineers and export compliance lead from day one.

The plan by phase

PhaseRealistic duration (2026 ballpark)DeliverableWho signs off
Discovery2 to 3 weeksSitemap, list of test facilities, buyer journeysCommercial director
Design2 to 4 weeksDesktop and mobile page templatesCommercial and marketing
Copy and asset gathering2 to 4 weeks, alongside designFacility sheets, programme referencesFacility managers
Technical and export review2 to 5 weeksCopy and photos cleared for publicationEngineers, export compliance lead, named clients
Build4 to 8 weeksFull site on stagingProject lead
Testing and launch1 to 2 weeksFixes, redirects, go liveCommercial director

Export review is specific to space: some facility specifications, client hardware photos or programme details may fall under UK strategic export controls or contractual restrictions. Your compliance lead should clear every page, using guidance from the Export Control Joint Unit where needed.

Week by week schedule

Illustrative 16 week project, median scenario.

WeeksMain activityWatch point
1 to 2Discovery workshops, inventory of shakers, thermal vacuum chambers, radiation sourcesList now what must never be published
3 to 5Design and facility sheet copySupply engineering approved specifications
6 to 8Technical and export review, consent requests to named clientsClient replies often take 2 to 3 weeks
7 to 13Build, test enquiry form with file uploadFreeze the sitemap after week 8
14References to UK Space Agency funded programmes checked with partnersUse only public programme names and approved wording
15Full QA, mobile and form testsTest large attachment uploads
16Launch, redirects, monitoringCheck old URLs redirect and stay indexed

At Kolonell, the build phase is short: Growth in 14 to 21 working days and Premium in 21 to 30 working days once content is cleared. Kolonell's prices are 1,830 to 3,050 EUR for Growth and 3,050 to 5,340 EUR for Premium, with copywriting at about 90 EUR per page. Internal review weeks stay the same whatever provider you pick.

The most common causes of delay

CauseTypical delay (2026 ballpark)Fix
Technical copy late2 to 4 weeksOne content owner per test facility, with dates
Late export review2 to 5 weeksInvolve the compliance lead at discovery
Client consent to cite a programme2 to 6 weeksPrepare an anonymised version in parallel
Sitemap changes during build1 to 3 weeksFreeze structure after design
Facility photos to reshoot1 to 3 weeksBook the shoot in week 3
Accessibility fixes found at QA1 to 2 weeksTest against WCAG 2.2 AA from design stage

Mini case study

Illustrative example, fictional company: Priya, commercial director of a 55 person space test lab in London, wants the new site live before a major space industry conference and has 18 weeks.

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

You are :

Local agency scenario: 28,000 GBP, 16 planned weeks, plus a likely 3 week slip on export review, so 19 weeks and the conference is missed. Kolonell scenario: 6 weeks of discovery, copy and review run in house, then Premium at 4,800 EUR plus 12 extra pages at about 40 EUR each (480 EUR), so 5,280 EUR, delivered in 6 weeks. Total: 12 weeks, leaving 6 weeks of buffer, with Standard maintenance at 114 EUR a month. If the site brings 2 extra test campaign enquiries worth 35,000 GBP each around the conference, that is 70,000 GBP of potential revenue.

FAQ

Why does export review take so long?

Every facility specification and programme reference needs clearance from your compliance lead, sometimes with client consent. Plan 2 to 5 weeks.

Can the project be cut to 8 weeks?

Yes, if content is written and cleared before kickoff. Otherwise 10 to 20 weeks is the realistic market range.

Should we name client programmes?

Only with written consent. An anonymised line such as qualification of a 120 kg instrument for an Earth observation satellite already reassures buyers.

What budget should we plan?

Between 13,000 and 42,000 GBP on the market depending on facilities and languages. Kolonell's Premium tier costs 3,050 to 5,340 EUR.

When should we start before a conference?

At least 20 weeks ahead with a typical agency, 12 to 14 weeks if content is ready. Keep 2 weeks of buffer for QA.

Let's scope your project. Tell us your test facilities, languages and target launch date, and we will build a week by week plan and a firm Growth or Premium budget. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#website timeline#space test lab website#web agency London#website rebuild plan#website design#realistic timeline#London
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.