Websites11 min read

Public Agency Website Tender Specification Guide in London for 2026

Mohamed Bah·Fondateur, Kolonell
October 15, 2026
Share:
Public Agency Website Tender Specification Guide in London for 2026

Public Agency Website Tender Specification Guide in London for 2026

Websites

The verdict in three sentences

A poorly written specification produces bids that cannot be compared, from 30,000 to 300,000 GBP for the same need, and a website delivered without editorial governance. For a London public body, the realistic 2026 budget is 60,000 to 150,000 GBP through G-Cloud, with a 3-level approval workflow, WCAG 2.2 AA accessibility as required by the Public Sector Bodies Accessibility Regulations, and a 4 to 6 month delivery. The specification must pin down functional requirements, hosting and support (2,500 to 6,000 GBP per month), otherwise run costs become the real hidden expense.

The essential sections of the specification

The head of communications drafting the requirement must describe the current state, the audiences (residents, businesses, partners, media) and the statutory content. Here is the recommended structure, with each lot's weight in the budget.

Specification sectionExpected contentShare of budget2026 order of magnitude
Context, goals, user needsMission, success metrics, GDS-style user researchn/aWritten in-house
Discovery and UX designInformation architecture, prototypes, design system15 to 20%10,000 to 30,000 GBP
Build and CMSTemplates, approval workflow, site search35 to 45%25,000 to 65,000 GBP
Official documents and contracts moduleNotices, tenders, awards, filterable archive10 to 15%7,000 to 20,000 GBP
WCAG 2.2 AA accessibility and auditCompliance, accessibility statement8 to 12%5,000 to 15,000 GBP
Content migration and trainingArchive migration, training 10 to 20 editors8 to 10%5,000 to 12,000 GBP
Hosting, security, backups (year 1)UK or EU hosting, Cyber Essentials Plus5 to 8%4,000 to 10,000 GBP

Require a priced breakdown following these lots in the call-off: it is the only way to compare bids line by line.

Technical requirements to impose on suppliers

Some requirements must be pass or fail, others scored. The table below proposes a scoring grid suited to a London public body.

RequirementLevelHow it is checkedImpact if missing
3-level approval workflow (author, team lead, director)Pass or failLive demo at clarificationUncontrolled publishing
WCAG 2.2 AA accessibilityPass or failThird-party audit on 10 template pagesLegal non-compliance, excluded users
UK or EU hosting, data under controlPass or failHost attestation, Cyber Essentials PlusData sovereignty risk
Multilingual support for community languagesScored (10 points)Templates and translation workflowExcluded residents
Mobile performance (LCP under 2.5 s)Scored (10 points)Lighthouse on prototypeMobile visitors drop off
99.9% availability and daily backupsScored (10 points)Contract terms and service creditsExtended outages
Exit plan and source code handoverPass or failIP clause, open standardsSupplier lock-in

The GOV.UK Service Standard is a useful reference even for bodies outside central government: it frames user research, open standards and accessibility in terms suppliers already know.

Timeline and support: what the annual budget must include

A project of this size runs 4 to 6 months: 3 to 4 weeks of discovery, 5 to 6 weeks of design, 8 to 10 weeks of build, 3 to 4 weeks of testing and migration. Corrective and evolutive support is contracted at 2,500 to 6,000 GBP per month, depending on the hours of change included (8 to 20 h) and guaranteed response time (4 h to 2 business days). Include it in the same G-Cloud call-off to avoid a second procurement.

Mini case study

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

You are :

Helen, head of communications at a 150-staff public body in London, has a 110,000 GBP envelope. She selects a 92,000 GBP build (including 11,000 GBP for accessibility and 14,000 GBP for the contracts module) and support at 3,500 GBP per month, so 42,000 GBP per year. Publishing notices and tender documents online removes about 7,000 GBP of yearly print and postage and cuts paper document requests by 70%. Three-year total cost reaches 218,000 GBP, about 6,050 GBP per month for an official channel open around the clock.

FAQ

What budget should a London public body plan for its website?

Budget 60,000 to 150,000 GBP for the build, depending on templates, modules and content volume to migrate. Add 2,500 to 6,000 GBP per month for support.

Why is WCAG 2.2 AA mandatory?

The Public Sector Bodies Accessibility Regulations 2018 require it, and the Government Digital Service monitors compliance. A third-party audit on 10 template pages costs 5,000 to 15,000 GBP.

Should we use G-Cloud or an open tender?

G-Cloud lets you award a call-off in 6 to 10 weeks with pre-qualified suppliers. An open procedure under the Procurement Act 2023 often takes 4 to 6 months longer.

How long do procurement and delivery take?

Plan 6 to 10 weeks for procurement and award, then 4 to 6 months for delivery. Launch within 8 months of starting the requirement is realistic.

How do we avoid supplier lock-in?

Require IP assignment on the code, delivery of source code and run documentation. An exit clause with handover within 30 days is the 2026 standard.

Let's scope your project. We help you frame the specification and price your public body website with approval workflow and accessibility, on an indicative budget of 60,000 to 150,000 GBP and a 4 to 6 month timeline. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#public agency website#website tender specification#G-Cloud website#public sector website London#WCAG accessibility#government web agency
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.