The verdict in three sentences
When a group of 5 plants carries CAD 4.5 million of spare parts inventory, a large share sits idle in one storeroom while another site orders the same reference. An inter-site exchange platform at CAD 60,000-100,000 makes that stock visible and transferable, with a realistic target of 15% lower parts purchasing. The project ships in 4 months, ERP integration included.
Why the ERP alone is not enough
In an agro-industrial group around Toronto (oilseed crushing, flour milling, packaging, animal feed, food processing), each plant runs its storeroom with its own item codes. The same SKF bearing or pump seal has three descriptions depending on the site. The ERP knows the quantities, but nobody knows an identical part is waiting in a plant two hours away while another orders it urgently with a 4 to 8 week lead time.
| Current situation | Cost impact (2026 estimate) |
|---|---|
| Item codes not harmonised across sites | 20 to 30% duplicate references |
| Parts with no movement for over 2 years | 25 to 35% of inventory value |
| Rush orders with express freight | 30 to 60% premium on the part |
| Standard supplier lead time | 4 to 8 weeks for imported components |
| Line stoppage for a missing part | CAD 20,000 to 80,000 of lost output per day |
| Group annual parts purchasing | About CAD 2 million |
What the platform does
The platform sits on top of the ERP. It builds a unified catalogue with photos, matches equivalent references and lets a maintenance manager request a transfer in three clicks.
| Module | Function | 2026 budget |
|---|---|---|
| Unified master data | De-duplication, manufacturer equivalents, photos | CAD 15,000 to 25,000 |
| Search and availability | Search by reference, brand, machine, site | CAD 8,000 to 14,000 |
| Transfer requests | Request, approval, shipping, receipt workflow | CAD 12,000 to 18,000 |
| ERP integration | Stock and movement sync (SAP, Dynamics 365, Odoo) | CAD 12,000 to 25,000 |
| Dashboard | Idle stock, completed transfers, purchases avoided | CAD 6,000 to 10,000 |
| Storeroom mobile app | Photos, cycle counts, barcode scanning | CAD 7,000 to 8,000 |
The heaviest workstream is not technical: it is master data cleansing. For 18,000 items, allow 6 to 8 weeks of joint work between storekeepers and a data team, in parallel with development.
Plan and governance
| Phase | Duration | Checkpoint |
|---|---|---|
| Scoping and data audit | 3 weeks | Duplicate rate measured, inter-site transfer rules |
| Catalogue and workflow development | 7 weeks | Demo on 2 sites |
| ERP integration | 4 weeks in parallel | Stock synced nightly |
| Pilot on 2 plants | 3 weeks | First 20 real transfers |
| Rollout to 5 sites and training | 3 weeks | 40 users trained |
The internal recharge rule between subsidiaries must be settled before development: transfer price at weighted average cost, shared freight, and tax treatment of transfers between separate legal entities, to be validated with your accountant.
Mini case study
Need a professional website?
Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.
David, technical director of an agro-industrial group in Toronto, runs 5 plants and CAD 2 million of parts purchasing a year. The platform is quoted at CAD 80,000, with CAD 12,000 annual maintenance. If it avoids just 8% of purchases in year one, CAD 160,000, the project pays back in about 6 months. At the 15% target, savings reach CAD 300,000 a year, before counting fewer rush orders and line stoppages. Freeing idle stock, about 10% of CAD 4.5 million, also improves cash by CAD 450,000.
FAQ
How much does an inter-site spare parts exchange platform cost?
Between CAD 60,000 and 100,000 as a 2026 estimate, depending on item count, ERP and mobile app. Annual maintenance runs around CAD 8,000 to 15,000.
Do we need to change ERP?
No, the platform connects to the existing ERP and syncs stock nightly or in real time. Transfer movements are posted back to the ERP to keep a single inventory ledger.
How long does master data cleansing take?
Allow 6 to 8 weeks for 15,000 to 20,000 items. De-duplication often reveals 20 to 30% of identical references under different names.
How are transfers between different subsidiaries handled?
Through an internal transfer rule set upfront, often weighted average cost plus freight. The platform generates transfer documents that accounting imports.
What return on investment can we expect?
With CAD 2 million of annual purchasing, 15% savings means CAD 300,000 a year. Even a cautious 5% result pays back a CAD 80,000 budget in under 10 months.
Let's scope your project. Tell us your number of sites, items and your ERP for a costed scope, an indicative budget and a 4-month plan. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.
Mohamed Bah
Fondateur, Kolonell
Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.