Websites11 min read

Fibre rollout tracking software for a telecom subcontractor in Dublin: 2026 cost

Mohamed Bah·Fondateur, Kolonell
October 27, 2026
Share:
Fibre rollout tracking software for a telecom subcontractor in Dublin: 2026 cost

Fibre rollout tracking software for a telecom subcontractor in Dublin: 2026 cost

Websites

The verdict in three sentences

For a telecom subcontractor building 300 km of fibre a year in and around Dublin for two operators, rollout tracking software costs 60,000 to 140,000 EUR in 2026. It centralizes work orders, geotagged photos, offline field surveys and the as-built packs operators require. The most profitable result is financial: the invoicing cycle drops from 45 to 15 days, freeing a significant amount of cash.

What fibre rollout software must do in Ireland

The technical director of a subcontractor manages civils, cabling and connection crews spread across Dublin, Kildare and Meath. Operators reject any claim without timestamped photos, GPS coordinates and OTDR test results. Today, that evidence arrives by WhatsApp and email, is filed by hand in spreadsheets and goes missing. Rural sites have patchy coverage, so the app must work offline and sync when signal returns.

ModuleScope2026 cost (estimate)
Work ordersCreation, crew assignment, priorities, statuses12,000 to 28,000 EUR
Offline field appiOS and Android, forms, geotagged photos, signatures18,000 to 40,000 EUR
MappingRoutes, chambers, closures, progress by section10,000 to 22,000 EUR
As-built packsAutomatic generation in each operator's format9,000 to 20,000 EUR
Management dashboardkm built, crew productivity, margin per job6,000 to 15,000 EUR
Hosting, training (year 1)EU cloud, backups, 40 technicians trained5,000 to 15,000 EUR
TotalFull software60,000 to 140,000 EUR

International SaaS rollout platforms often charge 40 to 90 EUR per user per month, or 60,000 to 130,000 EUR over three years for 40 users, with limited adaptation to each operator's as-built format.

Cash flow and productivity: the deciding figures

A fibre subcontractor lives on cash flow. Between build and operator payment, it funds wages, fuel, plant hire and materials. Every day saved on invoicing reduces the funding requirement.

IndicatorBefore (WhatsApp and spreadsheets)After (field software)
Build to operator invoice45 days15 days
As-built packs rejected15 to 25 %under 5 %
Admin time per km6 to 8 h2 h
Lost photos or test resultsfrequentnear zero
Margin visibility per jobmonth endreal time
Site revisits for missing evidence8 to 12 a month1 to 2 a month

At 300 km a year and an average of 30,000 EUR invoiced per km, revenue reaches about 9 million EUR. Thirty days off the cycle frees about 740,000 EUR of working capital permanently, several times the software cost.

Scoping and rollout

Allow 3 to 4 months: 2 weeks of scoping with site managers and as-built leads, 8 to 10 weeks of development, then a pilot on a 10 to 15 km section before full rollout. Budget for rugged smartphones (250 to 450 EUR each) and data plans. GDPR applies to geolocation of staff, so define clear rules on when tracking is active.

Mini case study

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

You are :

Sean Murphy, technical director of a Dublin subcontractor, builds 300 km a year for two operators with 40 technicians. As-built packs take 7 admin hours per km, or 2,100 hours a year; the software brings that down to 600 hours, 1,500 hours freed, worth about 60,000 EUR at 40 EUR per hour. Rejections fall from 20 to 4 %, avoiding about 48 packs to redo at 1,500 EUR each: 72,000 EUR saved. For software at 110,000 EUR, payback comes in about 10 months, before counting the cash flow gain.

FAQ

Does the app work without signal?

Yes, surveys, photos and signatures are stored on the device and synced when coverage returns. A 64 GB phone holds about 8,000 pending photos.

Can we produce packs in each operator's format?

Yes, each operator has its own template (PDF, Excel, GIS export). Adding a new format costs 4,000 to 9,000 EUR.

What does maintenance cost?

Plan 15 to 20 % of the initial cost per year, so 9,000 to 28,000 EUR, hosting included.

Does the software also handle customer connections (FTTH)?

Yes, a connection module with appointment booking and optical tests adds 15,000 to 30,000 EUR.

Can payment be staged?

Yes, the quote can be split into three payments aligned with deliverables: scoping, pilot, full rollout.

Let's scope your project. Send us your annual km, your operator clients and their as-built formats, and we will cost the software, timeline and pilot. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#fibre rollout#telecoms#Dublin#2026 cost#work orders#field software
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.