Websites12 min read

Drupal to Next.js Replatform Cost for Public Sector in Berlin (2026)

Mohamed Bah·Fondateur, Kolonell
September 7, 2026
Share:
Drupal to Next.js Replatform Cost for Public Sector in Berlin (2026)

Drupal to Next.js Replatform Cost for Public Sector in Berlin (2026)

Websites

The verdict in three sentences

Staying on end-of-support Drupal 7 exposes a public body to unpatched vulnerabilities and accessibility rules that are ever harder to meet. In 2026, migrating to Next.js + a headless CMS costs between 25,000 and 60,000 EUR depending on page volume and integrations. The gain is not only technical: 3x performance, accessibility compliance and a maintenance cost cut in half.

Anatomy of the migration cost

The budget depends on the number of pages to migrate, template complexity and integrations (directory, e-services, mapping). Content migration and redirects often make up a third of the project.

Item2026 range (EUR)Detail
Scoping + architecture3,000 - 7,000audit, IA, CMS choice
Design system + templates6,000 - 14,000mockups, accessible components
Next.js development8,000 - 22,000front + headless integration
Content migration4,000 - 10,000500 to 2,000 pages moved
Redirects + SEO2,000 - 4,000301 redirect plan
Accessibility audit2,000 - 5,000AA compliance

Drupal 7 vs headless Next.js: the comparison

Moving to a decoupled stack separates content (headless CMS) from presentation (Next.js). Static rendering and a CDN transform the user experience, especially on mobile and slow connections.

CriterionDrupal 7 (legacy)Next.js + headless
Editor supportend-of-lifeactive, long term
Load time2.5 - 4 s0.8 - 1.2 s
Lighthouse score45 - 6590 - 99
Accessibilityhardnative, testable
Maintenance/yearhigh40-60 % lower
Securityknown flawsreduced surface

Mini case study

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

Mr Fall, IT director of a public body in Berlin, runs a 1,200-page Drupal 7 site with a directory and e-services. Migration quote for Next.js + headless: 42,000 EUR over 16 weeks, including 8,000 EUR of content migration and 3,500 EUR for an accessibility audit. On maintenance, he moves from 14,000 EUR/year (Drupal patches, security) to 6,000 EUR/year. The 8,000 EUR/year saving pays back the migration in about 5 years, before counting the brand gain and the breach risk avoided.

FAQ

Can we migrate without losing search rankings? Yes, provided you build an exhaustive plan of 301 redirects from old URLs to new ones. Never skip this step.

How long does a migration take? Between 12 and 20 weeks depending on page volume (500 to 2,000) and the number of integrations to rebuild.

Is accessibility mandatory? For a public body, yes: AA-level accessibility is a legal obligation. The audit and fixes must be budgeted from scoping.

Which headless CMS to choose? Strapi, Directus or Sanity depending on editorial needs. An open-source headless CMS avoids vendor lock-in.

What about obsolete legacy content? Migration is the chance to prune: only useful content is moved, which lowers migration cost and improves SEO.

Let's scope your project. A public or institutional site to migrate from Drupal to headless Next.js, with accessibility compliance? Tell us your page volume and integrations. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#Drupal migration#Next.js#public sector#headless CMS#accessibility#Berlin
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.