Websites11 min read

Corporate Website Redesign Quote in Berlin 2026

Mohamed Bah·Fondateur, Kolonell
September 6, 2026
Share:
Corporate Website Redesign Quote in Berlin 2026

Corporate Website Redesign Quote in Berlin 2026

Websites

The verdict in three sentences

You redesign a corporate site when the cost of technical debt exceeds the cost of building new: obsolete stack, capped SEO, sagging conversion. In Berlin in 2026, a redesign costs between EUR 12,000 and 40,000 depending on whether it is a simple reskin or a full rebuild with SEO migration. The number-one risk is not price: it is loss of organic traffic if the redirect plan is botched.

Redesign or patch: the decision rule

SignalPatch is enoughRedesign needed
Dated design but sound structure
Unmaintained CMS / security flaw
PageSpeed score < 40 on mobile
Sitemap illegible to Google
Cannot add a page without a dev
Conversion rate down > 20 %

If you tick two or more redesign signals, patching is like repainting a house with cracked foundations. A patch costs EUR 3,000 to 7,000; it only makes sense if the technical foundation is still sound.

Cost per redesign scenario 2026

ScenarioScopePrice EURTimeline
Reskin on existing stackNew design, same CMS8,000 - 14,0005-7 weeks
Structural redesignNew sitemap + Next.js + SEO18,000 - 28,00010-14 weeks
Redesign + content migration30-80 pages, redirects25,000 - 40,00014-20 weeks
Multi-site / group redesignCorporate + subsidiaries45,000+5-8 months

Structural redesign is the most common scenario for a Berlin SME: you keep the content but rebuild the architecture, speed, and technical SEO.

SEO ROI: what a clean redesign changes

A well-run redesign improves Core Web Vitals and architecture, which translates into rankings and traffic. Observed 2026 orders of magnitude over 6 months post-migration.

MetricBefore redesignAfter (6 months)
Mobile LCP4.2 s1.6 s
Mobile PageSpeed score3892
Pages on Google page 11447
Organic traffic/month2,4006,100
Form leads/month928

Conversely, a poorly prepared migration can crater traffic by 30 to 60 % for several months. The difference lies entirely in the 301 redirect plan and preserving strategic URLs.

Migration plan with no traffic loss

  • Weeks 1-2: full crawl of the old site, mapping URLs and per-page traffic (Search Console + Analytics).
  • Weeks 3-4: 301 redirect matrix old → new URL, validated before any development.
  • Weeks 5-12: development on staging, content migrated, tags preserved.
  • Week 13: SEO QA (tags, sitemap, structured data, 100 % of redirects tested).
  • Go-live: switch on a low-traffic day, daily Search Console monitoring for 30 days.

Golden rule: no indexed URL should return a 404. Every strategic old page points to its equivalent via a 301.

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

Mini case study

Marc, MD of a B2B consulting firm in Berlin (35 staff), has a 7-year-old site: 2,400 visits/month, 9 leads/month, mobile PageSpeed at 38. He invests EUR 24,000 in a structural redesign with migration.

Six months later, traffic reaches 6,100 visits and leads 28/month. With an average engagement of EUR 15,000 and a 15 % closing rate, the 19 extra leads generate ~2.85 engagements/month = EUR 42,750 in additional monthly revenue. The EUR 24,000 is recovered in under three weeks of marginal revenue. A redesign is not a marketing cost, it is a commercial investment.

FAQ

When should I redesign rather than patch?

As soon as you tick two critical signals: unmaintained CMS, mobile PageSpeed < 40, inability to add content without a dev, or conversion down > 20 %. A EUR 3,000-7,000 patch only makes sense on a still-sound technical base.

How much does a corporate redesign cost in Berlin in 2026?

From EUR 8,000 for a reskin to EUR 40,000 for a full redesign with migration of 30 to 80 pages. The most common scenario, a structural redesign, runs EUR 18,000 to 28,000.

Will I lose my rankings during migration?

Not if the 301 redirect plan is built before development and tested 100 % before go-live. A poorly prepared migration can crater traffic by 30 to 60 %; a clean one grows it.

How long does a redesign take?

From 5-7 weeks for a reskin to 14-20 weeks for a redesign with content migration. SEO mapping and content production are the longest phases.

What ROI should I expect from a redesign?

Over 6 months, a clean redesign can double or triple organic traffic and multiply leads by 2 to 3. In our case study, EUR 24,000 invested generates over EUR 40,000 in additional monthly revenue.

Let's scope your project. Send us your current site URL and your goals (traffic, leads, rankings): we audit your stack and price the right redesign scenario. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#refonte#site corporate#devis#migration
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.