The verdict in three sentences
A plant running 60 injection moulding machines near Berlin with 7% unplanned downtime loses thousands of machine hours, damaged moulds and late-delivery penalties every year. In 2026, an off-the-shelf CMMS costs 40 to 90 EUR per user per month, while a custom CMMS costs 50,000 to 120,000 EUR and ships in 3 to 5 months. The right choice hinges on one capability: triggering preventive maintenance from machine and mould cycle counters, the main lever to lift availability from 85% to 92%.
The real problem: calendar maintenance does not fit injection moulding
In plastics processing, wear follows cycle counts, not weeks. A press running an 18-second cycle on three shifts wears its screw, check valve and moulds at a different pace from a 45-second press on two shifts. Calendar-based plans lead either to over-maintenance or to breakdowns. The CMMS must read cycle counters (via the PLC, Euromap 63 or 77, or an MES feed) and trigger work at the right threshold.
| Indicator | Typical situation before CMMS | Target 12 months later |
|---|---|---|
| Unplanned downtime | 7% of scheduled time | 3 to 4% |
| Availability | 85% | 90 to 92% |
| MTBF (press) | 120 h | 200 to 250 h |
| MTTR | 3.5 h | 2 h |
| Preventive share of interventions | 25% | 60 to 70% |
| Spare parts out of stock | 12 to 15 references a month | Fewer than 3 |
| Work order entry time | 15 min on paper | 3 min on tablet |
Packaged or custom: 2026 cost comparison
Off-the-shelf CMMS tools (European and international SaaS) handle the basics well: asset hierarchy, work orders, spare parts. They often struggle with fine-grained machine integration, managing moulds as mobile assets that move between presses, and injection-specific KPIs.
| Criterion | Off-the-shelf CMMS | Custom CMMS |
|---|---|---|
| Upfront cost | 3,000 to 15,000 EUR configuration | 50,000 to 120,000 EUR |
| Recurring cost | 40 to 90 EUR per user per month | Maintenance 800 to 2,000 EUR per month |
| Annual cost for 15 users | 7,200 to 16,200 EUR | 9,600 to 24,000 EUR |
| Deployment time | 1 to 3 months | 3 to 5 months |
| Cycle-counter preventive maintenance | Often manual entry | Automatic PLC or MES reading |
| Mould tracking across presses | Limited | Native, history per mould |
| ERP integration | Standard connectors | Built to measure |
| Code and data ownership | No | Yes |
Over 5 years for 15 users, an off-the-shelf CMMS costs about 39,000 to 96,000 EUR; a custom one about 98,000 to 240,000 EUR. The gap is justified when cycle-counter automation and mould tracking deliver measurable availability gains.
Typical custom CMMS plan: 3 weeks of shop-floor audit and asset inventory, 6 weeks for the core (assets, work orders, stock), 4 weeks for PLC and MES connectivity, 3 weeks of testing on a pilot line, then rollout across all presses.
Mini case study
Lukas, maintenance manager at a 60-press plant near Berlin, is an illustrative scenario. The plant runs 5,800 hours a year per press, or 348,000 machine hours. Cutting unplanned downtime from 7% to 4% frees 3 points, or 10,440 hours. If 40% of those hours become sold output, at a contribution margin of 30 EUR per press hour, the gain reaches 125,000 EUR a year.
For a custom CMMS at 90,000 EUR plus 12,000 EUR of annual maintenance, payback comes in about 10 months. An off-the-shelf CMMS at 12,000 EUR a year gives a similar result if it can read cycle counters; otherwise the real gain is often half as large.
Need a professional website?
Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.
FAQ
How much does a CMMS cost for a plastics plant in 2026?
An off-the-shelf CMMS costs 40 to 90 EUR per user per month plus 3,000 to 15,000 EUR of configuration. A custom CMMS ranges from 50,000 to 120,000 EUR depending on machine and ERP integrations.
Can the CMMS read press cycle counters?
Yes, through the PLC, Euromap 63 or 77 interfaces or the existing MES. On a mixed fleet of 60 presses, allow 3 to 5 weeks of integration.
Do technicians need tablets?
It is recommended: logging a work order drops from 15 minutes on paper to 3 minutes on a tablet. Ten rugged tablets cost roughly 4,000 to 7,000 EUR.
How are moulds that move between presses handled?
Each mould becomes an asset with its own cycle counter. The CMMS keeps every mould's history regardless of the press, so overhauls can be planned every 100,000 to 500,000 cycles depending on the tool.
How soon do results show?
First MTTR gains appear within 2 to 3 months. The 90 to 92% availability target is usually reached in 9 to 12 months, once enough history has built up.
Let's scope your project. Share your fleet size, press brands and ERP, and we will compare off-the-shelf and custom CMMS over 5 years and price a 3 to 5 month rollout. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.
Mohamed Bah
Fondateur, Kolonell
Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.
