The verdict in three sentences
In an industrial bakery with 9 baking lines near Amsterdam, 9% unplanned downtime hurts margin more than any software investment. A well-deployed CMMS, with preventive plans, tablet-based work requests and a spare parts store linked to assets, makes an OEE of 72% realistic against 62% today. A market CMMS is often enough; custom development makes sense when maintenance must connect tightly to production data and IFS Food or BRCGS requirements.
The hidden cost of line stoppages
With 9 lines on three shifts over about 6,000 hours a year, the plant has 54,000 line hours. At 9% unplanned downtime, 4,860 hours vanish: enrober chain breaks, faulty oven probes, conveyor motors. Each stoppage also creates dough waste, extra cleaning and idle labour hours.
| Indicator | Current situation | Target at 18 months with CMMS |
|---|---|---|
| Unplanned downtime | 9% of planned time | 4 to 5% |
| Average OEE across 9 lines | 62% | 72% |
| Share of preventive work | 25 to 30% of interventions | 60% |
| Registered assets | 1,400 without reliable history | 1,400 with history and criticality |
| Average response time | 45 to 70 min | 20 to 30 min |
| Critical spare part stockouts | 6 to 10 a year | 1 to 2 a year |
| Waste linked to stoppages | 1.5 to 2.5% of output | Under 1% |
Going from 9% to 5% downtime frees about 2,160 line hours a year. With a contribution margin around EUR 350 per line hour, the stake exceeds EUR 750,000 a year.
What a CMMS must do in food manufacturing
The foundation is the asset tree of 1,400 items per line, with criticality, manufacturer documentation and history. Then come preventive plans by meter (oven hours, cycles) or calendar, work requests entered on tablets by line operators with photos, and a spare parts store with reorder points. In food manufacturing you must also trace interventions in production areas for IFS or BRCGS audits: food-grade lubricants, tool checks after work, cleaning sign-off.
| Option | 2026 cost | Deployment time | Fits if |
|---|---|---|---|
| Market SaaS CMMS | EUR 25 to 60 per user per month | 2 to 4 months | Standard processes |
| On-premise vendor CMMS | EUR 30,000 to 60,000 licences + 18% a year | 4 to 6 months | Strong internal IT requirements |
| Custom build by a Dutch integrator | EUR 45,000 to 100,000 | 5 to 8 months | Tight MES and IFS integration |
| Kolonell custom build | 2.5 to 15M+ FCFA (EUR 3,810 to 22,870+) depending on complexity | 3 to 5 months | Focused module (tablets, OEE), the rest on quote |
| Custom maintenance and hosting | 15 to 20% of the project per year | Ongoing | Any custom solution |
| Excel and paper logs | Near zero | Immediate | Fewer than 2 lines |
For 30 users (technicians, planning, stores, lead operators), a SaaS CMMS at EUR 45 a month costs EUR 16,200 a year, or EUR 81,000 over five years. A EUR 70,000 custom build plus EUR 12,000 annual maintenance reaches EUR 130,000 over five years: worth it only if integration with SCADA and real-time OEE bring a measurable gain.
Conditions for success
Software does not do preventive maintenance for you. Allow 3 to 4 months to clean up the asset tree and plans, appoint a half-time maintenance planner, and equip each line with an IP65 rugged tablet at EUR 600 to 1,200. Automatic meters from PLCs avoid manual entry of running hours.
Mini case study
Need a professional website?
Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.
Pieter de Vries, maintenance manager of the bakery, deploys a SaaS CMMS for 30 users, 9 tablets at EUR 900 and a custom OEE module linked to the PLCs at EUR 25,000. First-year cost: 16,200 + 8,100 + 25,000, about EUR 49,300. At 18 months, downtime falls to 6%, freeing 1,620 line hours. At EUR 350 per hour, the gain reaches EUR 567,000 a year: payback in about 5 weeks of recovered production.
FAQ
How much does a CMMS cost for a food plant near Amsterdam?
EUR 25 to 60 per user per month as SaaS, or EUR 45,000 to 100,000 for a custom build. A focused Kolonell module starts at 2.5M FCFA (EUR 3,810).
How long does it take to improve OEE?
First gains appear after 4 to 6 months; moving from 62 to 72% usually takes 12 to 18 months of disciplined preventive work.
Does a CMMS help with IFS audits?
Yes, it traces interventions in production areas, products used and return-to-service sign-offs, cutting audit preparation by several days.
Should we connect the PLCs?
It is recommended: automatic meters trigger preventive work at the right time and make OEE reliable, for an extra EUR 10,000 to 25,000.
What about the 1,400 existing assets?
Start with the 150 to 200 critical assets, which cause 80% of stoppages, then expand gradually.
Let's scope your project. Send us your number of lines, assets and current tools: we price a CMMS, tablets and OEE scope with an indicative budget and timeline. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.
Mohamed Bah
Fondateur, Kolonell
Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.