Websites11 min read

Custom CMMS for a water and wastewater utility: cost in Dublin in 2026

Mohamed Bah·Fondateur, Kolonell
November 2, 2026
Share:
Custom CMMS for a water and wastewater utility: cost in Dublin in 2026

Custom CMMS for a water and wastewater utility: cost in Dublin in 2026

Websites

The verdict in three sentences

For a utility running 9 wastewater treatment plants, 1,200 km of network and 40 pumping stations, a generic CMMS covers equipment maintenance but handles linear assets and regulatory indicators poorly. A custom CMMS at 50,000 to 110,000 EUR excluding VAT, connected to the GIS, geolocates assets, drives mobile work orders and on-call rotas, and feeds the annual performance report. The expected return: 15 to 25% fewer bursts and overflows and weeks of reporting saved every year.

Off-the-shelf or custom CMMS: costs compared

Off-the-shelf CMMS products are designed for industry first. For a utility, you often need extra network modules, a GIS connector and specific development for performance indicators.

Item (2026 ballpark)Off-the-shelf CMMSCustom CMMS
Initial cost10,000 to 30,000 EUR of configuration50,000 to 110,000 EUR excl. VAT
Annual cost15,000 to 40,000 EUR of licences8,000 to 16,000 EUR of maintenance and hosting
5-year cost85,000 to 230,000 EUR90,000 to 190,000 EUR
GIS connector8,000 to 20,000 EUR add-onincluded in scope
Automatic regulatory indicatorspartialcomplete, in the utility's format
Offline field mobile appvendor dependentbuilt for no-coverage areas
Code ownershipnoyes, with reversibility

Over 5 years, the two options often converge. The difference lies in fit: a CMMS built for the network actually gets used by field crews, which drives data quality and therefore ROI.

Modules of a water and wastewater CMMS

Module2026 budget excl. VATTimeline
Geolocated assets (pipes, manholes, pumping stations, plants)12,000 to 25,000 EUR8 weeks
Mobile work orders with offline mode10,000 to 22,000 EUR8 weeks
Preventive equipment maintenance (pumps, screens, aerators)8,000 to 18,000 EUR6 weeks
On-call rota and SCADA alerts6,000 to 14,000 EUR5 weeks
Regulatory indicators and automated annual report8,000 to 16,000 EUR6 weeks
Two-way GIS connector6,000 to 15,000 EUR5 weeks
Project total50,000 to 110,000 EUR excl. VAT6 to 9 months

Linking to pumping station telemetry automatically creates a work order on alarm and logs overflows, data expected by environmental regulators.

Public procurement and project delivery

A utility buys under public procurement rules: above thresholds, a tender procedure is required. A functional specification split into lots makes bids easier to compare. Plan a pilot on one network sector and 2 plants for 2 months before full rollout, plus data migration from the old tool and the GIS.

Mini case study

Aoife, technical director of a water and wastewater utility near Dublin, records 180 bursts and overflows a year, with an average intervention, repair and clean-up cost of 2,800 EUR. That is 504,000 EUR a year. Her team also spends about 6 person-weeks compiling the annual report and indicators.

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

You are :

The utility invests 85,000 EUR excluding VAT in a custom CMMS. Thanks to preventive maintenance targeted at high-risk sections, incidents fall by 18%, meaning 32 incidents avoided and 90,700 EUR saved per year. Automated reporting frees 5 person-weeks, about 9,000 EUR. With 12,000 EUR of annual maintenance, the net gain reaches 87,700 EUR a year: the project pays back in under 12 months.

FAQ

Does the CMMS work without mobile coverage in the field?

Yes, the app works offline and syncs data once back in coverage. This module accounts for 10,000 to 22,000 EUR excluding VAT of the budget.

Can we reuse data from our current GIS?

Yes, the two-way GIS connector costs 6,000 to 15,000 EUR excluding VAT and avoids double entry of assets.

How long does deployment take?

Plan 6 to 9 months for the full project, including a 2-month pilot on one sector and 2 treatment plants.

Is the annual report really automatic?

Indicators are calculated from logged interventions. The report is generated in a few hours instead of 6 person-weeks, provided crews log their work.

What budget for a small utility with 3 plants?

A reduced scope (assets, mobile work orders, indicators) sits between 35,000 and 55,000 EUR excluding VAT.

Let's scope your project. Describe your assets, current tools and procurement constraints, and we will price a CMMS of 50,000 to 110,000 EUR excluding VAT split into lots. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#CMMS#water utility#wastewater#network maintenance#Dublin#CMMS cost 2026
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.