E-commerce11 min read

B2B E-commerce Migration Project Cost in Dubai: 2026 Roadmap

Mohamed Bah·Fondateur, Kolonell
September 12, 2026
Share:
B2B E-commerce Migration Project Cost in Dubai: 2026 Roadmap

B2B E-commerce Migration Project Cost in Dubai: 2026 Roadmap

E-commerce

The verdict in three sentences

Migrating from an ageing catalogue site (PrestaShop, Magento 1) to a modern B2B platform costs 40,000-120,000 EUR in 2026, depending on whether you re-platform onto Shopify Plus/Adobe Commerce or rebuild custom. The project runs 3-6 months and involves migrating 8,000-40,000 products plus order history. The line item that sinks projects is not tech but SEO: without a rigorous 301 redirect plan, you lose 20-40 % of organic traffic.

SaaS re-platforming or custom rebuild?

CriterionSaaS re-platformingCustom rebuild
Budget40,000 - 75,000 EUR70,000 - 120,000 EUR
Timeline3 - 4 months4 - 6 months
Native B2B featuresGood (limits)Unlimited
Subscription / licence2,000 - 3,500 EUR/moHosting 200 - 700 EUR/mo
Checkout customizationLimitedTotal
Data migrationTooledBespoke
Maintenance800 - 1,500 EUR/mo1,000 - 2,000 EUR/mo
ReversibilityLowHigh (code delivered)

SaaS re-platforming suits SMEs that want speed and outsourced infra. Custom wins when business logic (pricing, credit, ERP) is specific or when volume makes the SaaS subscription costlier than self-hosting.

Migration phases

PhaseContentTypical duration
1. Audit & mappingURLs, data, integrations, existing SEO2 - 4 weeks
2. Design & mockupsB2B journeys, accounts, pricing3 - 5 weeks
3. Build & data migrationProducts, customers, history6 - 12 weeks
4. 301 redirects & QASEO plan, tests, ERP2 - 4 weeks
5. Cutover & hypercareGo-live, monitoring1 - 2 weeks

Budget by line item (2026 order of magnitude)

ItemRange (EUR)
Audit & scoping3,000 - 8,000
B2B UX/UI6,000 - 18,000
Platform development18,000 - 60,000
Data & catalogue migration5,000 - 15,000
ERP connector6,000 - 15,000
SEO & 301 redirects3,000 - 8,000
QA & hypercare4,000 - 10,000

SEO risks: the line item you cannot miss

Need a professional website?

Kolonell builds websites that attract clients, optimized for the Sénégalese market. Free quote in 2 minutes.

Prefer a call back?

Leave your WhatsApp number and a Kolonell expert will get back to you within 1 business day. Free, no strings attached.

RiskImpactCountermeasure
Changed URLs without 301-20 to -40 % trafficExhaustive redirect plan
Lost tags & structured dataSERP dropMigrate title/meta/JSON-LD
Long cutover downtimePartial de-indexingCutover < 4 h, DNS prepped
Truncated catalogue contentLost long tailMigrate full descriptions
Sitemap not submittedSlow re-indexingSitemap + IndexNow at go-live

Mini case study

Sarah is GM of a Dubai electrical-supplies trading SME: 22,000 SKUs, a 2016 PrestaShop on its last legs. She budgets 86,000 EUR for a custom rebuild over 5 months, with an ERP connector and SEO plan. Cutover happens on a Sunday, downtime 3 h 10. Thanks to 4,200 301 redirects, organic traffic returns to baseline in 5 weeks then grows +15 % over six months, driven by the new reorder journeys. The commercial productivity gain (self-service) covers the 1,500 EUR/month maintenance from the first quarter.

FAQ

How long does a B2B migration take? From 3 to 6 months depending on data volume and integration complexity. Underestimating the audit phase is the classic mistake: it is what secures SEO and the ERP.

Will I lose my rankings? Not if the 301 redirect plan is exhaustive and tested before cutover. A 2-5 week dip is normal; without a plan, loss can reach 40 % and last months.

Can we migrate without service interruption? We target under 4 hours of downtime by prepping DNS, freezing orders during cutover, and switching during a low-activity window (night or weekend).

Must everything migrate, including history? Order history and customer accounts are essential in B2B (reorders, credit). Dead data (obsolete products, inactive accounts) can be archived rather than migrated.

SaaS or custom for an SME? SaaS is faster and outsources infra; custom wins on reversibility and TCO above a certain volume. The choice depends mostly on how specific your pricing logic and ERP are.

Let's scope your project. Send us your SKU count, current platform and ERP integrations: we will frame SaaS or custom, with an indicative budget (40,000-120,000 EUR) and a secure cutover plan. Detailed quote within 48 h. WhatsApp +221 77 596 93 33.

Tags:#B2B e-commerce migration#re-platforming#Dubai#Adobe Commerce#Shopify Plus#SEO#migration cost#SME
Share:

Mohamed Bah

Fondateur, Kolonell

Passionate about digital and entrepreneurship in Africa, Mohamed has been helping Sénégalese businesses with their digital transformation since 2020. Founder of Kolonell, he believes every SME deserves a professional and accessible online présence.